| LOCKHEED MARTIN CORPDESIGN, DEVELOPMENT, TEST&EVALUATION OF PROJECT ORION | 541710 | CO | $15,537,343,262 | Sep 30, 20260 mo 2 offers | |
| AMENTUM TECHNOLOGY, INC.ENGINEERING SERVICES AND SCIENCE CAPABILITY AUGMENTATION (ESSCA) | 541715 | AL | $1,995,377,617 | Nov 30, 20262 mo 3 offers | |
| CALIFORNIA INSTITUTE OF TECHNOLOGYWIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) CORONAGRAPH THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2) FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3) SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4) DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5) PERFORM PROJECT TASKS INVOLVING: (I) AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, (II) EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND/OR (III) GROUND-BASED SYSTEMS. 6) BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7) JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASA S DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8) JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS (STEM) DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR. | 541715 | CA | $391,511,913 | Jan 31, 20274 mo | |
| SOUTHWEST RESEARCH INSTITUTEAS THE PRINCIPAL INVESTIGATOR (PI) INSTITUTION FOR THE MAGNETOSPHERIC MULTISCALE (MMS) INSTRUMENT SUITE SCIENCE TEAM (ISST), THE CONTRACTOR IS RESPONSIBLE FOR LEADING THE SOLVING MAGNETOSPHERIC ACCELERATION RECONNECTION AND TURBULENCE (SMART) TEAM THROUGH ALL MISSION PHASES. THE SCOPE OF WORK SHALL INCLUDE, BUT NOT BE LIMITED, TO THE FOLLOWING: - MANAGE THE SMART TEAM THROUGH PHASES B THROUGH E OF THE MMS MISSION, - DEFINING SCIENCE GOALS AND OBJECTIVES - ASSIST THE MMS PROJECT AND HQ SCIENCE MISSION DIRECTORATE HELIOPHYSICS DIVISION IN THE PREPARATION OF LEVEL 1 REQUIREMENTS FOR THE MMS MISSION - FLOW-DOWN OF TOP-LEVEL MISSION REQUIREMENTS TO THE APPROPRIATE ELEMENTS OF THE INSTRUMENT SUITE - DESIGN, FABRICATION, INTEGRATION, CALIBRATION, TESTING AND DELIVERY OF FOUR FULLY QUALIFIED, FLIGHT INSTRUMENT SUITES TO OBSERVATORY INTEGRATION AND TEST (I&T) PLUS SPARES - DESIGN, DEVELOPMENT, INTEGRATION AND TESTING OF THE SOC - SUPPORT OBSERVATORY-LEVEL I&T ACTIVITIES - PROVIDE SUSTAINING ENGINEERING AND I&T SUPPORT OF THE INSTRUMENT SUITES AFTER DELIVERY TO NASA - RESPONSIBILITY FOR THE ON-ORBIT OPERATION, HEALTH AND SAFETY OF THE INSTRUMENT SUITES - RESPONSIBILITY FOR OPERATING AND MAINTAINING THE SOC POST-LAUNCH - ESTABLISHING AND MANAGING SUBCONTRACTS WITH INSTRUMENT SUITE TEAM MEMBERS - ESTABLISHING AND MAINTAINING THE REQUIRED INTERNATIONAL TRAFFIC IN ARMS REGULATIONS (ITAR) AND EXPORT CONTROL DOCUMENTATION NECESSARY FOR WORKING WITH ITS INTERNATIONAL TEAM MEMBERS - IMPLEMENTATION OF AN EPO PROGRAM FOR THE MMS MISSION | 336414 | TX | $388,441,648 | Sep 30, 20260 mo 999 offers | |
| L3HARRIS TECHNOLOGIES, INC.OPTICAL TELESCOPE ASSEMBLY (OTA) THIS CONTRACT PROVIDES FOR ALL EFFORTS AND RESPONSIBILITIES FOR THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO BUILD, REFURBISH, OR MODIFY THE OTA AS REQUIRED TO MEET THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) PERFORMANCE REQUIREMENTS. | 333314 | NY | $378,907,168 | Jan 31, 20274 mo 1 offer | |
| CALIFORNIA INSTITUTE OF TECHNOLOGYSURFACE WATER AND OCEAN TOPOGRAPHY (SWOT) 83-16443 | 541715 | CA | $316,070,719 | Sep 30, 20260 mo | |
| BAE SYSTEMS SPACE & MISSION SYSTEMS INC.THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE). | 336414 | CO | $315,478,942 | Jan 31, 20274 mo 2 offers | |
| PHANTOM SPACE CORPVENTURE-CLASS ACQUISITION OF DEDICATED AND RIDESHARE (VADR) UMBRELLA TASK ORDER. | 481212 | AZ | $300,000,000 | Jan 27, 20274 mo 16 offers | |
| RELATIVITY SPACE, INC.VENTURE-CLASS ACQUISITION OF DEDICATED AND RIDESHARE (VADR) UMBRELLA TASK ORDER. | 481212 | CA | $300,000,000 | Jan 31, 20274 mo 16 offers | |
| BLUE ORIGIN, LLCVENTURE-CLASS ACQUISITION OF DEDICATED AND RIDESHARE (VADR) UMBRELLA TASK ORDER. | 481212 | FL | $300,000,000 | Feb 3, 20275 mo 16 offers | |
| IMPULSE SPACE, INC.NEW AWARD OF UMBRELLA TASK ORDER. | 481212 | CA | $300,000,000 | Feb 3, 20275 mo 3 offers | |
| ASTRA SPACE OPERATIONS, LLCVENTURE-CLASS ACQUISITION OF DEDICATED AND RIDESHARE (VADR) UMBRELLA TASK ORDER. | 481212 | CA | $300,000,000 | Feb 1, 20275 mo 1 offer | |
| SPACE EXPLORATION TECHNOLOGIES CORP.VENTURE-CLASS ACQUISITION OF DEDICATED AND RIDESHARE (VADR) UMBRELLA TASK ORDER. | 481212 | CA | $300,000,000 | Feb 3, 20275 mo 1 offer | |
| MOMENTUS SPACE LLCVENTURE-CLASS ACQUISITION OF DEDICATED AND RIDESHARE (VADR) UMBRELLA TASK ORDER. | 481212 | CA | $300,000,000 | Feb 3, 20275 mo 3 offers | |
| LONG WALL COMPANYVENTURE-CLASS ACQUISITION OF DEDICATED AND RIDESHARE (VADR) UMBRELLA TASK ORDER. | 481212 | CA | $300,000,000 | Feb 3, 20275 mo 1 offer | |
| UNITED LAUNCH SERVICES, LLCVENTURE-CLASS ACQUISITION OF DEDICATED AND RIDESHARE (VADR) UMBRELLA TASK ORDER | 481212 | CO | $300,000,000 | Feb 3, 20275 mo 1 offer | |
| NORTHROP GRUMMAN SYSTEMS CORPORATIONVENTURE-CLASS ACQUISITION OF DEDICATED AND RIDESHARE (VADR) UMBRELLA TASK ORDER. | 481212 | AZ | $300,000,000 | Feb 2, 20275 mo 16 offers | |
| L2 SOLUTIONS LLCVADR UMBRELLA TASK ORDER | 481212 | TX | $300,000,000 | Feb 3, 20275 mo 1 offer | |
| ARROW SCIENCE AND TECHNOLOGY, L.L.C.NEW AWARD OF UMBRELLA TASK ORDER. | 481212 | TX | $300,000,000 | Feb 3, 20275 mo 3 offers | |
| CALIFORNIA INSTITUTE OF TECHNOLOGYSURFACE BIOLOGY & GEOLOGY (SBG): PRE-PHASE A AND PHASE A PLAN | 541715 | CA | $258,697,495 | Sep 28, 20260 mo | |
| CALIFORNIA INSTITUTE OF TECHNOLOGYADVANCED MULTI-MISSION OPERATING SYSTEM (AMMOS) (93-107877) | 541715 | CA | $220,522,338 | Sep 27, 20260 mo | |
| KBR WYLE SERVICES, LLCHHPC2 TO | 541715 | TX | $217,263,842 | Sep 30, 20260 mo 1 offer | |
| SOUTHWEST RESEARCH INSTITUTETHE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION HAS SELECTED JUNO NEW FRONTIERS MISSION UNDER THE DIRECTION OF PRINCIPAL INVESTIGATOR (PI) DR. SCOTT BOLTON TO CONTINUE DEVELOPMENT WITH THE EXPECTATION THAT THE JUNO MISSION WILL ENTER PHASE B IN EARLY FISCAL YEAR 2006. THE JUNO MISSION WILL BE MANAGED BY THE MARSHALL SPACE FLIGHT CENTER, NEW FRONTIERS PROGRAM OFFICE. KEY JUNO TEAM MEMBERS INCLUDE DR. BOLTON'S HOME INSTITUTION, THE SOUTHWEST RESEARCH INSTITUTE (SWRI), THE JUNO IMPLEMENTATION TEAM LEADER JET PROPULSION LABORATORY (JPL) AND THE SPACECRAFT BUS PROVIDER THE LOCKHEED MARTIN SPACE SYSTEMS DIVISION (LM/SS). THE PI'S TEAM AT SWRI NEEDS TO BEGIN WORK ON A SUBSET OF PHASE B ACTIVITIES AS EARLY IN FY06 AS POSSIBLE. THIS SOW PROVIDES A LIST OF ACTIVITIES THAT ARE NECESSARY TO BEGIN WORK IN FY06 AND THEIR ASSOCIATED DELIVERABLES. THE JUNO MISSION IS A COLLABORATION BETWEEN SOUTHWEST RESEARCH INSTITUTE (SWRI), JPL, LOCKHEED MARTIN (LM), AND A COMPLEMENTARY TEAM OF UNIVERSITIES AND FIELD CENTERS. THE PRINCIPAL INVESTIGATOR, DR. SCOTT BOLTON, IS AT SOUTHWEST RESEARCH INSTITUTE (SWRI) AND IS RESPONSIBLE TO NASA FOR ALL ASPECTS OF THE MISSION INCLUDING ACHIEVING ALL SCIENTIFIC OBJECTIVES AND MISSION GOALS. JPL PROVIDES THE PROJECT MANAGER WHO OVERSEES THE DAY-TO-DAY MANAGEMENT OF THE PROJECT AND WILL REPORT TO THE PI. PRINCIPAL INVESTIGATOR (PI) DR. SCOTT BOLTON IS RESPONSIBLE TO NASA FOR MEETING THE SCIENTIFIC OBJECTIVES OF THE JUNO MISSION WITHIN COST AND SCHEDULE. AS PI, DR. BOLTON HAS DIRECT ACCOUNTABILITY TO THE NASA NEW FRONTIERS PROGRAM OFFICE FOR THE IMPLEMENTATION OF JUNO. ALL JUNO SCIENCE CO-IS, THE DEPUTY PI AND PROJECT SCIENTIST, THE SCIENCE INVESTIGATION OFFICE MANAGER, THE E/PO EFFORT, THE JUNO ADVISORY BOARD AND THE PM REPORT DIRECTLY TO DR. BOLTON. THE PI DELEGATES THE DAY-TO-DAY MANAGEMENT OF THE PROJECT TO THE PROJECT MANAGER (PM), RICK GRAMMIER. THE PROJECT SYSTEM ENGINEER, PAYLOAD MANAGER, FLIGHT SYSTEM MANAGER, MISSION MANAGER, SCIENCE OPS CENTER, BUSINESS MANAGER, LM CONTRACT CTM, AND MISSION ASSURANCE MANAGER ALL REPORT DIRECTLY TO THE PM. | 541710 | TX | $184,270,441 | Oct 15, 20261 mo 1 offer | |
| GENERAL ELECTRIC COMPANYTHE REQUIREMENT IS TO ASSIST NASA IN ACCELERATING THE INTRODUCTION OF MEGAWATT CLASS EAP SYSTEMS INTO FUTURE AIRCRAFT PRODUCTS BY U.S. INDUSTRY. THIS EFFORT HELPS TO IDENTIFY CERTIFICATION GAPS, AND ADDRESS GAPS THROUGH GROUND TEST AND FLIGHT TESTS. | 541715 | OH | $179,079,108 | Sep 29, 20260 mo 7 offers | |
| CGI FEDERAL INC.PROGRAM SUPPORT SERVICES (CPSS) PROGRAMMATIC SUBJECT MATTER EXPERT (SME) IDIQ TASK ORDER FOR MARSHALL SPACE FLIGHT CENTER (MSFC). | 541715 | AL | $158,758,421 | Aug 31, 20260 mo | |
| YULISTA SOLUTIONS, LLCTHE PURPOSE OF CHARLES IS TO PROVIDE SUPPORT FOR AIRCRAFT AT JSC, BASED AT ELLINGTON FIELD IN HOUSTON, AND AT EL PASO, TEXAS | 488190 | TX | $158,631,267 | Sep 30, 20260 mo | |
| LANTERIS SPACE LLCTHE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. | 336414 | CA | $154,211,029 | Feb 28, 20275 mo 2 offers | |
| THE LELAND STANFORD JUNIOR UNIVERSITYGAMMA RAY LARGE AREA SPACE TELESCOPE (GLAST). THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUPPORTING NASA REVIEWS&DIRECTED ENGINEERING ANALYSIS, OBSERVATION PLANNING, MISSION SCHEDULING, SATELLITE OPERATIONS, SCIENCE DATA PROCESSING SUPPORT, SPACECRAFT HEALTH/SAFETY/PERFORMANCE ANALYSIS, INSTRUMENT PERFORMANCE SUPPORT ANALYSIS, FLIGHT/GROUND SYSTEM&SOFTWARE, AND ANOMALY RESOLUTION&ANALYSIS. | 541710 | CA | $132,603,830 | Mar 1, 20276 mo 51 offers | |
| CALIFORNIA INSTITUTE OF TECHNOLOGYVERITAS (VENUS EMISSIVITY, RADIO SCIENCE, INSAR, TOPOGRAPHY, AND SPECTROSCOPY) (41-108259) | 541715 | CA | $121,764,064 | Sep 27, 20260 mo | |
| ARES TECHNICAL SERVICES CORPORATIONKENNEDY EXPLORATION GROUND SYSTEMS (EGS) PROGRAM (LX) SUPPORT SERVICES CONTRACT THREE (KLXS III). | 541330 | FL | $118,128,448 | Sep 30, 20260 mo 7 offers | |
| HONEYBEE ROBOTICS LLCDRAGONFLY RELOADABLE LANDER TO EXPLORE TITAN'S PREBIOTIC CHEMISTRY AND HABITABILITY ANNOUNCEMENT OF OPPORTUNITY NNH16ZD011O | 541330 | CA | $113,861,507 | Feb 19, 20275 mo 12 offers | |
| CALIFORNIA INSTITUTE OF TECHNOLOGYSPHEREX MISSION IS AN ALL-SKY NEAR-INFRARED SPECTRAL SURVEY SATELLITE. | 541715 | CA | $108,158,922 | May 31, 20260 mo 3 offers | |
| CALIFORNIA INSTITUTE OF TECHNOLOGYTHE ULTRAVIOLET EXPLORER (UVEX) | 541715 | CA | $106,965,269 | Feb 7, 20275 mo 15 offers | |
| LEIDOS, INC.CARGO MISSION CONTRACT 4 (CMC4) | 541330 | TX | $93,449,713 | Sep 30, 20260 mo 1 offer | |
| CALIFORNIA INSTITUTE OF TECHNOLOGYPHYSICAL OCEANOGRAPHY DISTRIBUTED ACTIVE ARCHIVE CENTER-2 (PO.DAAC-2) THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2) FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3) SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4) DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5) PERFORM PROJECT TASKS INVOLVING: (I) AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, (II) EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND/OR (III) GROUND-BASED SYSTEMS. 6) BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7) JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASA S DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8) JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS (STEM) DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR. | 541715 | CA | $89,599,542 | Sep 30, 20260 mo | |
| CALIFORNIA INSTITUTE OF TECHNOLOGYSMAP (SOIL MOISTURE ACTIVE/PASSIVE) MISSION 88-12659 | 541715 | CA | $82,674,393 | Nov 30, 20262 mo | |
| MAGNIX USA INCTHE REQUIREMENT IS TO ASSIST NASA IN ACCELERATING THE INTRODUCTION OF MEGAWATT CLASS EAP SYSTEMS INTO FUTURE AIRCRAFT PRODUCTS BY U.S. INDUSTRY. THIS EFFORT HELPS TO IDENTIFY CERTIFICATION GAPS, AND ADDRESS GAPS THROUGH GROUND TEST AND FLIGHT TESTS. | 541715 | WA | $74,353,783 | Sep 29, 20260 mo 7 offers | |
| CALIFORNIA INSTITUTE OF TECHNOLOGYPRODUCTION SYSTEM: DATA PRODUCTS (SNWG 18-2, SNWG 18-4, SNWG 18-5) IN SUPPORT OF SATELLITE NEEDS WORKING GROUP (SNWG) 2018-2019 (83-108220) | 541715 | CA | $62,442,911 | Sep 27, 20260 mo | |
| TECHTRANS INTERNATIONAL INCRUSSIAN LANGUAGE AND LOGISTICS SERVICES. | 541930 | TX | $56,951,211 | Sep 30, 20260 mo 1 offer | |
| CALIFORNIA INSTITUTE OF TECHNOLOGYCLOUDSAT PHASE E MISSION OPERATIONS 88-11198 | 541715 | CA | $55,094,441 | Sep 30, 20260 mo | |
| CALIFORNIA INSTITUTE OF TECHNOLOGYATMOSPHERIC INFRARED SOUNDER (AIRS) ADVANCED MICROWAVE SOUNDING UNIT (AMSU) HUMIDITY SOUNDER FROM BRAZIL (HSB) PROJECT TEAM LEADER FACILITY 88-8223 | 541715 | CA | $52,846,176 | Sep 30, 20260 mo | |
| YULISTA SOLUTIONS, LLCCHARLES CONTRACT TO PROVIDE SUPPORT FOR AIRCRAFT AT LARC. INCLUDES AIRCRAFT MAINTENANCE, FLIGHT OPERATIONS, ENGINEERING, LIFECYCLE, QUALITY, SAFETY, AND OTHER RELATED SUPPORT FOR A VARIETY OF AIRFRAMES, ENGINES, APPLIANCES, AND SUPPORT EQUIPMENT | 488190 | AL | $45,364,184 | Feb 28, 20275 mo | |
| CALIFORNIA INSTITUTE OF TECHNOLOGYJPL EARTH EXPLORER MISSIONS OFFICE 89-9108 | 541715 | CA | $37,909,071 | Sep 30, 20260 mo | |
| THE REGENTS OF THE UNIVERSITY OF COLORADOPROVIDE ENGINEERING ANALYSES, HARDWARE & SOFTWARE DEVELOPMENT, FABRICATION, INTEGRATION, TEST, EVALUATION, INTEGRATION WITH SPACECRAFT, LAUNCH, INSTRUMENT ACTIVATION, CALIBRATION, VALIDATION, & OPERATIONS THROUGH 60-DAY CHECKOUT FOR TSIS2 PAYLOAD. | 336419 | CO | $37,239,061 | Dec 12, 20263 mo 1 offer | |
| A & H-AMBICA JV LLCTHIS IS THE SECOND PHASE OF A MULTI-PHASE PROJECT. PHASE 2 CONSISTS OF THE REMOVAL AND REPLACEMENT.OF THE EXISTING ROOFING SYSTEM IN THE NORTHEAST QUADRANT OF BUILDING 103. | 236210 | LA | $36,143,358 | Nov 27, 20262 mo 5 offers | |
| THE JOHNS HOPKINS UNIVERSITY APPLIED PHYSICS LABORATORY LLCMARS-MOON EXPLORATION WITH GAMMA RAYS AND NEUTRONS (MEGANE) PHASE C/D - TASK ORDER UNDER AEROSPACE RESEARCH, DEVELOPMENT, AND ENGINEERING SUPPORT (ARDES) II CONTRACT 80MSFC20D0004 | 541715 | MD | $33,808,876 | Nov 30, 20262 mo | |
| NOVA SPACE SOLUTIONS, LLCCOMBINED OPERATIONS, SERVICES, MAINTENANCE, AND INFRASTRUCTURE CONTRACT (COSMIC) BASE YEAR - CORE COST-PLUS INCENTIVE FEE (CPIF) FUNDING ORDER | 561210 | MS | $32,987,736 | Sep 30, 20260 mo | |
| UNIVERSITY OF ALASKA FAIRBANKSTHE OBJECTIVE OF THIS EFFORT IS TO PROVIDE NASA AND OTHER U.S. GOVERNMENT AGENCIES (WORKING THROUGH NASA) WITH A DOMESTIC, NORTHERN LATITUDE, SOUNDING ROCKET LAUNCH SITE FOR CONDUCTING SCIENTIFIC INVESTIGATIONS. | 561210 | AK | $30,000,000 | Nov 30, 20262 mo 1 offer | |
| KATALYST SPACE TECHNOLOGIES, LLCSBIR PHASE III - 80NSSC25C0510 - SWIFT SALVO | 541715 | AZ | $29,787,000 | Sep 1, 20260 mo 1 offer | |
| CALIFORNIA INSTITUTE OF TECHNOLOGYSCIENCE MISSION DIRECTORATE, EARTH SCIENCE APPLIED SCIENCE PROGRAM THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2) FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3) SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4) DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5) PERFORM PROJECT TASKS INVOLVING: (I) AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, (II) EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND/OR (III) GROUND-BASED SYSTEMS. 6) BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7) JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASA S DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8) JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS (STEM) DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR. | 541715 | CA | $27,772,876 | Aug 30, 20260 mo | |