agencyvintage FY2021–FY2025 full archives · USAspending.gov, 2026-08-06recomputed Aug 15, 2026

Expiring in 12 mo1,249
Value at stake$69.6B
Expiring in 24 mo1,499
Value, 24 mo$91.9B

When they end

2026-08: 1752026-09: 4572026-10: 1252026-11: 492026-12: 632027-01: 322027-02: 702027-03: 522027-04: 162027-05: 222027-06: 452027-07: 662027-08: 772027-09: 1152027-10: 122027-11: 102027-12: 122028-01: 92028-02: 82028-03: 172028-04: 162028-05: 112028-06: 132028-07: 172026-082028-07

Each bar is one month of expiries. The lighter bars sit beyond the 12-month window.

Matching contracts

Narrow byNAICSStateMin $Max $Max biddersNever competedSmall incumbentMin openness

Narrow this list to what you can actually bid on. Filter by industry code, place of performance, contract size, and how many bidders showed up last time.

national-aeronautics-and-space-administration has thousands of expiring contracts. Most are too large, too small, or in the wrong industry for any one company. See plans

1,219 contracts worth $34.5B match. Showing 51–100.

IncumbentNAICSWork inCurrent valueEndsOpenness
CALIFORNIA INSTITUTE OF TECHNOLOGYDSN APERTURE ENHANCEMENT PROJECT (DAEP) THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2) FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3) SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4) DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5) PERFORM PROJECT TASKS INVOLVING: (I) AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, (II) EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND/OR (III) GROUND-BASED SYSTEMS. 6) BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7) JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASA S DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8) JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS (STEM) DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR.541715CA$68,900,000Jun 30, 20279 mo
CALIFORNIA INSTITUTE OF TECHNOLOGYPRODUCTION SYSTEM: DATA PRODUCTS (SNWG 18-2, SNWG 18-4, SNWG 18-5) IN SUPPORT OF SATELLITE NEEDS WORKING GROUP (SNWG) 2018-2019 (83-108220)541715CA$62,442,911Sep 27, 20260 mo
TECHTRANS INTERNATIONAL INCRUSSIAN LANGUAGE AND LOGISTICS SERVICES.541930TX$56,951,211Sep 30, 20260 mo 1 offer
UTAH STATE UNIVERSITY SPACE DYNAMICS LABORATORYTHE ATMOSPHERIC WAVES EXPERIMENT (AWE) IS PROPOSED BY THE UTAH STATE UNIVERSITY RESEARCH FOUNDATION (USURF) IN RESPONSE TO NASAS 2016 HELIOPHYSICS EXPLORERS MISSION OF OPPORTUNITY ANNOUNCEMENT NNH12ZDA005O-HPEXMO. THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY USURF DURING THE PHASE A (AWE) CONCEPT STUDIES. USURF SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE AWE PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE. 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED AWE INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE AWE INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE AWE SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS.USURF SHALL PROVIDE A BRIEFING ON THE AWE SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. USURF SHALL PROVIDE AN ORGANIZATION CHART DEFINING USURF ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE USURF PI PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE.. USURF SHALL DEVELOP A AWE INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A AWE MISSION SYSTEMS REQUIREMENTS DOCUMENT. USURF SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. USURF SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. USURF SHALL LEAD THE SCIENCE TEAM. USURF SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST.541713UT$55,881,950Mar 31, 20276 mo 2 offers
CALIFORNIA INSTITUTE OF TECHNOLOGYCLOUDSAT PHASE E MISSION OPERATIONS 88-11198541715CA$55,094,441Sep 30, 20260 mo
CALIFORNIA INSTITUTE OF TECHNOLOGYATMOSPHERIC INFRARED SOUNDER (AIRS) ADVANCED MICROWAVE SOUNDING UNIT (AMSU) HUMIDITY SOUNDER FROM BRAZIL (HSB) PROJECT TEAM LEADER FACILITY 88-8223541715CA$52,846,176Sep 30, 20260 mo
GENERAL ATOMICSTO PROVIDE SPACECRAFT DEVELOPMENT & TEST OBSERVATORY I&T OBSERVATORY TESTING SHIPMENT TO THE LAUNCH SITE SUPPORT OF LAUNCH OPERATIONS ON-ORBIT PERFORMANCE VERIFICATION OPERATION OF MISSION OPERATIONS CENTER, 3 YEARS MISSION OPS&DECOMMISSIONING.336414CA$48,018,311May 30, 20278 mo 3 offers
YULISTA SOLUTIONS, LLCCHARLES CONTRACT TO PROVIDE SUPPORT FOR AIRCRAFT AT LARC. INCLUDES AIRCRAFT MAINTENANCE, FLIGHT OPERATIONS, ENGINEERING, LIFECYCLE, QUALITY, SAFETY, AND OTHER RELATED SUPPORT FOR A VARIETY OF AIRFRAMES, ENGINES, APPLIANCES, AND SUPPORT EQUIPMENT488190AL$45,364,184Feb 28, 20275 mo
THE JOHNS HOPKINS UNIVERSITY APPLIED PHYSICS LABORATORY LLCJOHNS HOPKINS UNIVERSITY APPLIED PHYSICS LABORATORY (JHU/APL) SUPPORTS THE ELECTROJET ZEEMAN IMAGING (EZIE) PHASE B PROJECT AND ITS CONSTITUENT PROJECTS.541715MD$43,593,915Mar 31, 20276 mo
KINETX INCTHE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT.334511AZ$40,864,053Mar 31, 20276 mo 3 offers
CALIFORNIA INSTITUTE OF TECHNOLOGYJPL EARTH EXPLORER MISSIONS OFFICE 89-9108541715CA$37,909,071Sep 30, 20260 mo
THE REGENTS OF THE UNIVERSITY OF COLORADOPROVIDE ENGINEERING ANALYSES, HARDWARE & SOFTWARE DEVELOPMENT, FABRICATION, INTEGRATION, TEST, EVALUATION, INTEGRATION WITH SPACECRAFT, LAUNCH, INSTRUMENT ACTIVATION, CALIBRATION, VALIDATION, & OPERATIONS THROUGH 60-DAY CHECKOUT FOR TSIS2 PAYLOAD.336419CO$37,239,061Dec 12, 20263 mo 1 offer
A & H-AMBICA JV LLCTHIS IS THE SECOND PHASE OF A MULTI-PHASE PROJECT. PHASE 2 CONSISTS OF THE REMOVAL AND REPLACEMENT.OF THE EXISTING ROOFING SYSTEM IN THE NORTHEAST QUADRANT OF BUILDING 103.236210LA$36,143,358Nov 27, 20262 mo 5 offers
CALIFORNIA INSTITUTE OF TECHNOLOGYECOSYSTEMS SPACEBORNE THERMAL RADIOMETER EXPERIMENTS ON SPACE STATION (ECOSTRESS) 87-19641541715CA$36,072,466Mar 28, 20276 mo
THE JOHNS HOPKINS UNIVERSITY APPLIED PHYSICS LABORATORY LLCMARS-MOON EXPLORATION WITH GAMMA RAYS AND NEUTRONS (MEGANE) PHASE C/D - TASK ORDER UNDER AEROSPACE RESEARCH, DEVELOPMENT, AND ENGINEERING SUPPORT (ARDES) II CONTRACT 80MSFC20D0004541715MD$33,808,876Nov 30, 20262 mo
NOVA SPACE SOLUTIONS, LLCCOMBINED OPERATIONS, SERVICES, MAINTENANCE, AND INFRASTRUCTURE CONTRACT (COSMIC) BASE YEAR - CORE COST-PLUS INCENTIVE FEE (CPIF) FUNDING ORDER561210MS$32,987,736Sep 30, 20260 mo
UNIVERSITY OF ALASKA FAIRBANKSTHE OBJECTIVE OF THIS EFFORT IS TO PROVIDE NASA AND OTHER U.S. GOVERNMENT AGENCIES (WORKING THROUGH NASA) WITH A DOMESTIC, NORTHERN LATITUDE, SOUNDING ROCKET LAUNCH SITE FOR CONDUCTING SCIENTIFIC INVESTIGATIONS.561210AK$30,000,000Nov 30, 20262 mo 1 offer
KATALYST SPACE TECHNOLOGIES, LLCSBIR PHASE III - 80NSSC25C0510 - SWIFT SALVO541715AZ$29,787,000Sep 1, 20260 mo 1 offer
CALIFORNIA INSTITUTE OF TECHNOLOGYSCIENCE MISSION DIRECTORATE, EARTH SCIENCE APPLIED SCIENCE PROGRAM THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2) FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3) SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4) DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5) PERFORM PROJECT TASKS INVOLVING: (I) AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, (II) EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND/OR (III) GROUND-BASED SYSTEMS. 6) BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7) JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASA S DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8) JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS (STEM) DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR.541715CA$27,772,876Aug 30, 20260 mo
LOCKHEED MARTIN CORPTHIS PROCUREMENT PROVIDES FOR THE LABOR, TRAVEL AND ASSOCIATED BURDENS NECESSARY TO SATISFY THE PHASE A CONCEPT STUDY REPORT (CSR) AND BRIDGE PHASE B OPTION REQUIREMENTS OF NASA'S COMPETITIVELY SELECTED DAVINCI+ MISSION.336414CO$27,181,068Sep 30, 20260 mo 5 offers
NORTHROP GRUMMAN SYSTEMS CORPORATIONTHE CONTRACTOR WILL PROVIDE THE PRODUCTS AND SERVICES TO SUPPORT THE JAMES WEBB SPACE TELESCOPE PHASE E OPERATIONS AND SUSTAINMENT.541715CA$27,100,599Jun 24, 20279 mo 1 offer
TBP&JJ WORLDWIDE SERVICES LLCFACILITIES OPERATIONS AND MAINTENANCE SERVICES (FOMS), JANITORIAL SERVICES, AND GROUNDS MAINTENANCE.531210CA$25,396,067Jan 13, 20274 mo 8 offers
ALEUT BUILDING COMPANY LLCLAUNCH CONTROL CENTER AND VEHICLE ASSEMBLY BUILDING HEATING VENTILATION AND AIR CONDITIONING REPLACEMENT.238220FL$25,351,874Apr 30, 20277 mo 1 offer
SOUTHWEST RESEARCH INSTITUTETHE PRINCIPAL PURPOSE OF THIS REQUIREMENT WITHIN THE SWFO PROJECT IS TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, CALIBRATE, EVALUATE AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE SWIPS INSTRUMENT AS PART OF THE SWFO-L1 OBSERVATORY.336414TX$24,070,648Nov 5, 20262 mo 2 offers
COLSA CORPNASA NTSS CONTRACT YEAR 3 TASK ORDER541611MS$23,563,056Sep 30, 20260 mo
CALIFORNIA INSTITUTE OF TECHNOLOGYEZIE: ELECTROJET ZEEMAN IMAGING EXPLORER 71-107848541715CA$22,706,023Apr 30, 20277 mo
APACHE INNOVATIONS JVTHE PURPOSE OF THIS CONTRACT IS TO PROVIDE LOGISTICS SERVICES, STOCK PURCHASES, AND METROLOGY/CALIBRATION SERVICES TO NASA GRC.541614OH$22,371,227Mar 31, 20276 mo 4 offers
HEALTHEON, INCAVIATION LOGISTICS OPERATIONS FACILITY (ALOF) DESIGN-BUILD236210TX$22,138,782Apr 13, 20277 mo 1 offer
METIS TECHNOLOGY SOLUTIONS, INC.SIMULATION AND SUPPORT SERVICES FOR LANGLEY RESEARCH CENTER.541330VA$21,610,841Nov 30, 20262 mo
NOVA SPACE SOLUTIONS, LLCTHIS COSMIC TASK ORDER IS CREATED FOR FUNDING OF THE COSMIC CORE SERVICES FOR COST PRICE INCENTIVE FEE CLIN 1004 OF 80SSC025D0001.561210LA$21,560,285Sep 30, 20260 mo
OSI VISION LLCTECHNICAL WORKFORCE EDUCATION AND EXPERTISE DEVELOPMENT SERVICES (TWEEDS) IN SUPPORT OF THE APPEL KS PROGRAM611430FL$21,010,161Oct 31, 20261 mo 3 offers
CALIFORNIA INSTITUTE OF TECHNOLOGYBUILDING 183 SEISMIC BRACING CONSTRUCTION541715CA$21,000,000Apr 28, 20277 mo
THUNDERCAT TECHNOLOGY, LLCTHIS IS RE-OBLIGATION OF PREVIOUS AWARD, WHICH WAS DE-OBLIGATED AND CANCELED. THIS TASK ORDER WITH OPTIONS IS FOR SERVICENOW PER THE ATTACHED QUOTE # DATED . THIS TASK ORDER INCLUDES A ONE YEAR BASE PERIOD AND FOUR (4) ONE YEAR OPTION PERIODS.541519VA$20,910,349Sep 26, 20260 mo 1 offer
ADVANCED SPACE LLCPHASE III - CAPSTONE EXTENDED MISSION541715CO$20,776,504Sep 30, 20260 mo 500 offers
AHTNA TARGET JV, LLCCENTER WIDE DEMOLITION OF ABANDONED STRUCTURES AND BUILDINGS NO LONGER IN USE BY MSFC OR THE AGENCY LOCATED ON MSFC.562910AL$20,519,755Jul 30, 202710 mo 1 offer
FIREFLY AEROSPACE INC.COMMERCIAL LUNAR PAYLOAD SERVICES (CLPS)481212TX$19,323,865Aug 31, 202711 mo 2 offers
BLUE ORIGIN WASHINGTON, LLCCOMMERCIAL LUNAR PAYLOAD SERVICES (CLPS) TASK ORDER CT-3481212WA$18,597,991Jan 31, 20274 mo 1 offer
HAMILTON SUNDSTRAND SPACE SYSTEMS INTERNATIONAL, INC.DELIVER THE UNIVERSAL WASTE MANAGEMENT SYSTEM (UWMS) FOR TECHNOLOGY DEMONSTRATION TO THE INTERNATIONAL SPACE STATION (ISS). PROVIDE SUSTAINING ENGINEERING SERVICES FOR THREE YEARS OF UWMS OPERATIONS.541330TX$16,773,281Sep 30, 20260 mo
DIVERSIFIED CONSTRUCTION OF OKLAHOMA, INC.BOOSTER FABRICATION FACILITY (BFF) INTERIORS RENOVATIONS, KENNEDY SPACE CENTER, FLORIDA236210FL$16,030,986Feb 26, 20275 mo 3 offers
FLORIDA POWER & LIGHT COMPANYKSC ELECTRIC UTILITY SERVICE221122FL$16,017,726Jun 30, 20279 mo
AIRBORNE SYSTEMS NORTH AMERICA OF CA INCEO14042 PROVIDES THE DESIGN, ANALYSIS, FABRICATION, TESTING, QUALITY ASSURANCE, DOCUMENTATION, AND DELIVERY OF A PARACHUTE DECELERATOR SUBSYSTEM THAT WILL OFFER THE DECELERATION NECESSARY TO DELIVER THE DRAGONFLY MISSION LANDER TO SURFACE OF TITAN.541715CA$15,992,577Apr 30, 20277 mo 2 offers
GEXA ENERGY, LPELECTRICITY SUPPLY & ANCILLARY SERVICES FOR JSC (JSC, EF, SCTF)221112TX$15,800,915Jan 31, 20274 mo
LUMINARY LABS LLCNASA OPEN INNOVATION SERVICES 2 (NOIS2) CROWDSOURCING NOIS2-105 MAGNETIC CHALLENGE PHASE 4541990NY$15,390,701Sep 28, 20260 mo 5 offers
CALIFORNIA INSTITUTE OF TECHNOLOGYIND OMNIBUS SUPPORT AGREEMENT FOR NASA DIRECTED MISSIONS (91-210214)541715CA$14,550,385Mar 27, 20276 mo
CALIFORNIA INSTITUTE OF TECHNOLOGYMISSION ANALYSIS PLATFORM541715CA$14,150,888Dec 27, 20263 mo
PLANET LABS FEDERAL, INC.COMMERCIAL SATELLITE DATA ACQUISITION (CSDA) PROGRAM. TASK ORDER FOR ELECTRO OPTICAL TASKING DATA.541990VA$13,500,000Nov 24, 20262 mo 4 offers
LEAD BUILDERS INCCOF SUBSTATION 1236220CA$12,887,188Oct 30, 20261 mo 3 offers
CALIFORNIA INSTITUTE OF TECHNOLOGYDEMO OF FACILITIES, MECHANICAL, AND ELECTRICAL ASSETS541715CA$12,666,175Aug 15, 202711 mo
AMENTUM SERVICES, INC.FILMSS 2 CODE S IDIQ TASK ORDER: TO PROVIDE PROGRAM, SCIENCE, ENGINEERING, OPERATIONS AND PROJECT MANAGEMENT SUPPORT FOR BIOSCIENCES FLIGHT DEVELOPMENT PROJECTS AND COLLABORATIVE SCIENCE PROGRAMS.541715CA$12,614,654Nov 30, 20262 mo
1 - 8A ISO9001 FEDSYNC-BFS, LLCFULL-TIME, PART-TIME, AND TEMPORARY SECRETARIAL SUPPORT AT JOHNSON SPACE CENTER AND WHITE SANDS TEST FACILITY.561110TX$11,960,704Sep 30, 20260 mo

Showing 50 of 1,768 expiring contracts. Unlock filters, sorting, alerts and CSV export →

How to read this

A contract that drew a single offer last time is a wider door than its size suggests — we mark those. Small-business incumbents approaching a size threshold are the other pattern worth watching.

Derived from prime contract end dates in USAspending.gov. An end date is not a solicitation: agencies extend, consolidate, and occasionally let work lapse.